A client asks for one more page. It seems small enough to add while you are already working on the site. Then the page needs a new navigation item, a different form and content that has not been written. The change is still possible, but its size is no longer obvious from the original request.
Capture the request in neutral language. State what the client wants to add or change, why they want it and which agreed deliverable it affects. Do not begin with a defensive explanation of why it is outside scope. First make sure you and the client mean the same thing.
Compare the request with the current scope. It may already be included, or it may replace something of similar effort. If it changes the work, describe the effect on cost, schedule, dependencies and anything that must be checked again. An extra page may be simple; changing the underlying booking system may affect almost every page.
Give the client a usable choice
Offer the options that genuinely fit the situation. You might add the work now with a revised date, exchange it for an existing item or place it in a later phase. Explain the consequences of each instead of presenting an unsupported “small change fee.”
For example, adding a new service page before content approval may fit the current design work but require additional writing. Adding it after navigation and testing are complete creates different tasks. The same visible output can have a different effect depending on when it enters the project.
Record the decision before starting the added work. Reference the original project and keep the approved change alongside its scope and schedule. If the client has not decided, say which work can continue and which part is waiting. Do not let a pending request silently become an accepted commitment.
Update the relevant documents once the change is approved. A revised price in email is not enough if the delivery list and calendar still describe the previous job. Give the change an identifier or date so that both sides can refer to it without searching through a long thread.
There will be small adjustments that you reasonably absorb. Make that judgment deliberately and explain the boundary if needed. Consistently recording material changes keeps generosity from turning into an invisible new baseline for the rest of the project.